City of Palo Alto Homepage
TEXT VERSION 
SEARCH FOR:
Downtown North

Downtown North is the residential neighborhood of Palo Alto that stretches from Alma Street to Middlefield Road, and from Lytton Avenue to San Francisquito creek. Downtown North residents have long been interested in finding ways to deal with persistent traffic problems in their neighborhood, including vehicle speeds and cut-through traffic. In February 2001, Palo Alto City Council authorized installation of a traffic calming trial plan and approved an associated set of performance measures. This traffic calming trial plan included seven street closures and was installed in June 2003. On March 24, 2004, the Palo Alto City Council directed staff to remove six of the street closures and install a new second traffic-calming plan including turn restrictions into the neighborhood during peak hours, three traffic circles and two speed tables. The second Downtown North traffic-calming plan was fully implemented in September 2004.

Next Steps

  • Public hearing on the results of the second Downtown North traffic-calming plan will be held on September 28, 2005 before Planning and Transportation Commission
  • Public hearing on the results of the second Downtown North traffic-calming plan before Palo Alto City Council will be held on a date to be determined

If you would like more information about this project, please contact:

Joseph Kott
City of Palo Alto Transportation Division
P.O. Box 10250
Palo Alto, CA 94303
Phone: (650) 329-2520
Fax: (650) 617-3108

Downtown North - What's New
News updates about the Downtown North Traffic Calming Project
[more]

Mailing Area Map
Mailing Area Map
Revision Date: 06/12/2006
Reports
Downtown North Traffic Calming Project
Revision Date: 02/25/2004
Downtown North Traffic Calming Project
Revision Date: 01/21/2004
Planning and Transportation Commission Recomendation to City Council
Revision Date: 02/25/2004
Report to the Planning and Transportation Commission
Revision Date: 06/12/2006
Second Trial Plan for Downtown North Traffic Calming Project
Revision Date: 08/09/2004
Second Trial Plan for Downtown North Traffic Calming Project Revised
Revision Date: 08/01/2005
Trial Plan
Evaluation Results in Terms of Performance Measures
Revision Date: 06/12/2006
Map of the First Trial Plan
Revision Date: 06/12/2006
Map of the Second Trial Plan
Revision Date: 06/12/2006
Map showing Before vs. After Traffic Volume Changes for Downtown North
Revision Date: 06/12/2006
Map Showing Before vs. After Traffic Volume Changes for Lytton Neighborhood
Revision Date: 06/12/2006
Spreadsheet Showing Before vs. After Traffic Counts
Revision Date: 06/12/2006
Acceptable Use PolicyAccessibilityYour PrivacySite MapSearch EngineComment FormMissing Content